Connect with us

News

£1.4bn signalling testing programme will affect Cambridgeshire rail travellers

Network Rail urge check before you travel

Avatar photo

Published

on

Thameslink and Great Northern services between London and Peterborough/King’s Lynn will be affected over the August 24-26 Bank Holiday weekend because of continuing work on the £1.4bn East Coast Digital Programme. Rail passengers are being advised to plan their journeys in advance ahead of pioneering work to test 21st century digital signalling systems on the East Coast Main Line.

The £1.4 billion-pound East Coast Digital Programme will see traditional, lineside signals replaced with signalling displayed inside drivers’ cabs, which will mean more reliable journeys and a greener railway for passengers in the future.

On Sunday 25 August, the first long-distance train will test the newly installed system between Welwyn Garden City and Hitchin at high speed.

This is in preparation for trains to run on this route using digital signalling from late 2025.

For the testing to be carried out under controlled conditions, the railway needs to be closed in and around the affected section.

There will be no Thameslink or Great Northern trains between Potters Bar, Peterborough and Royston, and between Hertford North and Stevenage on Sunday 25th August.

•East Coast Main Line passengers are urged to check before they travel due to pioneering digital signalling testing this August bank holiday.

• East Coast Main Line passengers are urged to check before they travel due to pioneering digital signalling testing this August bank holiday.

Evening services from approximately 22:00 on Saturday 24 August and early morning services on Monday 26 August, until 09:00 will also be affected.

Rail replacement buses will keep passengers on the move*, with people reminded to leave extra time for their journeys.

Long distance services on the East Coast Main Line will also be affected by the work and details can be found here.

The advice from Network Rail and train operators is to check before you travel by using www.nationalrail.co.uk.

Ed Akers, Network Rail’s industry partnership director, ECDP, said: “The testing work will take us a step closer to the introduction of digital, in-cab signalling on the East Coast Main Line, which will improve services for passengers and create a more reliable and resilient railway.

“We have carefully planned this work to avoid the busiest times of the August Bank Holiday weekend, and where possible passengers may be able to avoid this disruption by travelling before or after Sunday 25 August.  I want to thank those passengers who will be affected for their patience and understanding of this work”.

Chris Fowler, network operations and performance director for Govia Thameslink Railway which operates Thameslink and Great Northern trains said: “With no trains running on a key section of our route between London and Peterborough and Cambridge this August bank holiday, it’s essential that our customers plan ahead and allow plenty of extra time.”

The high speed European Train Control System (ETCS) testing planned for Sunday 25 August is expected to involve both a Grand Central Class 180 passenger train and a Network Rail Class 43 measurement train.

Testing and proving will continue between Welwyn and Hitchin at various stages in the coming months, involving different trains and onboard systems.

• East Coast Main Line passengers are urged to check before they travel due to pioneering digital signalling testing this August bank holiday.

• East Coast Main Line passengers are urged to check before they travel due to pioneering digital signalling testing this August bank holiday.

Advertisements
canopyuk.com in-article

Much of the work will be done overnight, avoiding any impact on regular passenger services.

For further information about the ECDP please visit www.eastcoastdigitalprogramme.co.uk

*More detail on rail replacement buses / service impacts

Sunday 25 August 

No trains will run between:

  • Potters Bar and St Neots
  • Potters Bar and Royston
  • Hertford North and Stevenage

A rail replacement bus service will run between:

  • Potters Bar and Hitchin
  • Hitchin and Royston
  • Hertford North and Stevenage
  • St Albans City and Stevenage via Hatfield
  • Luton Airport Parkway and Stevenage via Hitchin
  • St Neots and Bedford
  • St Neots and Hitchin

Trains will run between:

  • St Neots and Peterborough
  • Royston and Cambridge/Kings Lynn
  • London King’s Cross and Potters Bar
  • Moorgate and Potters Bar / Hertford North

 

Saturday 24 August, from 22:00 until end of service

No trains will run between:

  • Potters Bar and Hitchin
  • Potters Bar and Royston
  • Hertford North and Stevenage

Additionally, from 00:15, no trains will run between:

  • Hitchin and St Neots

From 22:00, a rail replacement bus service will run between:

  • Potters Bar and Hitchin
  • Hitchin and Royston
  • Hertford North and Stevenage
  • St Albans City and Stevenage via Hitchin

From 00:15, a rail replacement bus service will also run between:

  • Hitchin and St Neots

Monday 26 August, from start of service until approximately 09:00 

No trains will run between:

  • Potters Bar and St Neots
  • Hertford North and Stevenage

A rail replacement bus service will run between:

  • Potters Bar and Hitchin
  • Hitchin and Royston
  • Hertford North and Stevenage
  • St Albans City and Stevenage via Hatfield
  • Luton Airport Parkway and Stevenage via Hitchin
  • St Neots and Bedford
  • St Neots and Hitchin

For further information about the ECDP please visit www.eastcoastdigitalprogramme.co.uk

 

Facebook

Read More

News3 weeks ago

Cambs transport charity launches scathing attack after losing subsidised bus route to Stagecoach

FACT operated the 68 Wisbech service for a number of years

News3 weeks ago

Mayor attacks ‘cheap theatre of negativity’ over £48m Peterborough station facelift

Labour hopes Great Northern Hotel will be in future phase of re-development

News3 weeks ago

Opposition to 8am to 11pm pavement wining and dining in Wisbech by Wetherspoon

In Whittlesey Wetherspoon hope to use Market Place for outdoor drinkers

News3 weeks ago

Cambridge ‘drug lord’ caught with loaded gun, cash, and £500,000 worth of drug

Rahman ran a criminal enterprise across Cambridge

Mill Road, Cambridge: We should be following the lead of successful towns and cities around the globe in reducing traffic and making our shopping streets attractive places where people want to spend time. Mill Road, Cambridge: We should be following the lead of successful towns and cities around the globe in reducing traffic and making our shopping streets attractive places where people want to spend time.
News3 weeks ago

Opinion: We have a positive vision for a Mill Road Cambridge that is vibrant, attractive, safe, and healthy

'Surely it’s local residents who should decide the fate of a ‘C’ road'

On September 4 the Combined Authority board is being invited to re-appoint John Hill, East Cambridgeshire District Council chief executive, as returning officer for the mayoral election on May 1, 2025 On September 4 the Combined Authority board is being invited to re-appoint John Hill, East Cambridgeshire District Council chief executive, as returning officer for the mayoral election on May 1, 2025
News3 weeks ago

John Hill ‘bags’ top role in Cambridgeshire and Peterborough Combined Authority mayoral election 2025

Combined Authority has allocated £1.04m for the 2025 elections

Police are appealing for witnesses and dashcam footage after a man died in a collision on the B645 in Cambridgeshire Police are appealing for witnesses and dashcam footage after a man died in a collision on the B645 in Cambridgeshire
News3 weeks ago

Driver, 22, dies after B645 crash in Cambridgeshire

St Neots woman passenger has serious injuries

An electricity pylon in Oldfield Lane Wisbech caught fire after being used to illegally abstract power to run a cannabis factory in a neighbouring scrapyard. A second cannabis factory elsewhere was discovered. PHOTO: Policing Fenland/Cambs Fire and Rescue An electricity pylon in Oldfield Lane Wisbech caught fire after being used to illegally abstract power to run a cannabis factory in a neighbouring scrapyard. A second cannabis factory elsewhere was discovered. PHOTO: Policing Fenland/Cambs Fire and Rescue
News3 weeks ago

£700,000 worth of cannabis plants seized after ‘accidental’ Wisbech pylon fire

306 plants worth £257,000 were growing inside lorry trailers

A teenage boy has died following a collision on the A1M on Saturday (24 August). A teenage boy has died following a collision on the A1M on Saturday (24 August).
News3 weeks ago

Teenage Cambridgeshire crash victim, 16, dies in hospital

Crash victim named as Isaac Nockels

A 14-year-old girl was attacked at about 4.20pm on Wednesday, 21 August, in the red car park of Queensgate Shopping Centre, Peterborough. A 14-year-old girl was attacked at about 4.20pm on Wednesday, 21 August, in the red car park of Queensgate Shopping Centre, Peterborough.
News3 weeks ago

Wanted: Man in connection with sexual assault of 14-year-old girl in Peterborough

Assault happened at Queensgate shopping centre