Connect with us

News

£1bn A428 upgrade will ‘enhance lives of people in South Cambridgeshire and St Neots’

The route is the only remaining stretch of single carriageway between Cambridge and the M1 near Milton Keynes

Avatar photo

Published

on

Junior transport minister and South Cambridgeshire MP Anthony Browne led the groundbreaking ceremony for the £1bn A428 Black Cat to Caxton Gibbet improvement scheme. “This is not just an infrastructure project; it’s a transformative commitment to enhancing the lives of people in South Cambridgeshire, St Neots, and beyond,” he said.

Mr Browne was appointed Parliamentary Under Secretary of State in the Department for Transport last month having previously been appointed as the first Prime Minister’s Anti-Fraud Champion.

Skanska is delivering the improvement project on the A428 in Cambridgeshire to bring a new 10-mile dual carriageway between the Black Cat and Caxton Gibbet roundabouts.

MP and junior transport minister Anthony Browne at the ground breaking ceremony for the £1 billion transformation will create a new 10-mile dual carriageway and numerous junction improvements, transforming journeys between the A1 Black Cat roundabout in Bedfordshire and A428 Caxton Gibbet roundabout in Cambridgeshire.

MP and junior transport minister Anthony Browne at the ground breaking ceremony for the £1 billion transformation will create a new 10-mile dual carriageway and numerous junction improvements, transforming journeys between the A1 Black Cat roundabout in Bedfordshire and A428 Caxton Gibbet roundabout in Cambridgeshire.

The scheme, due for completion in 2027, will improve journeys between Milton Keynes, Bedford and Cambridge and the link between the M11 and M1.

The route is the only remaining stretch of single carriageway between Cambridge and the M1 near Milton Keynes.

Mr Browne said: “This project will mean lower journey times, less congestion, and cleaner air from St Neots to Cambourne.

“It also signifies our dedication to creating a more connected, safer, and sustainable future for our area. I’m proud to be delivering on that for our residents.”

Advertisements
canopyuk.com in-article

He said it was an ambitious plan to connect the A1 and A421 at the Black Cat roundabout to the Caxton Gibbet roundabout near Cambourne.

“Both roundabouts will undergo major upgrades to become modern, free-flowing junctions,” he said.

“The project includes a new junction at Cambridge Road, significantly improving access for St Neots, while leaving the existing A428 as a local road.

MP and junior transport minister Anthony Browne at the ground breaking ceremony for the £1 billion transformation will create a new 10-mile dual carriageway and numerous junction improvements, transforming journeys between the A1 Black Cat roundabout in Bedfordshire and A428 Caxton Gibbet roundabout in Cambridgeshire.

MP and junior transport minister Anthony Browne at the ground breaking ceremony for the £1 billion transformation will create a new 10-mile dual carriageway and numerous junction improvements, transforming journeys between the A1 Black Cat roundabout in Bedfordshire and A428 Caxton Gibbet roundabout in Cambridgeshire.

“As part of the plans, commuters can expect a reduction in journey times by more than a third at peak times, potentially saving up to an hour and a half weekly.

“The scheme also aims to improve road safety by separating local and long-distance traffic, reducing congestion, accidents, and rat running.”

He added: “The scheme also promises improved air quality for residents, with reduced vehicle emissions and enhanced biodiversity through new landscape planting and wildlife conservation measures.

“Plans are in place for 5.2 miles of new shared pathways for walkers, cyclists, and horse riders, with safe crossing points and right of way reconnections.”

 

Facebook

Read More

News3 weeks ago

Cambs transport charity launches scathing attack after losing subsidised bus route to Stagecoach

FACT operated the 68 Wisbech service for a number of years

News3 weeks ago

Mayor attacks ‘cheap theatre of negativity’ over £48m Peterborough station facelift

Labour hopes Great Northern Hotel will be in future phase of re-development

News3 weeks ago

Opposition to 8am to 11pm pavement wining and dining in Wisbech by Wetherspoon

In Whittlesey Wetherspoon hope to use Market Place for outdoor drinkers

News3 weeks ago

Cambridge ‘drug lord’ caught with loaded gun, cash, and £500,000 worth of drug

Rahman ran a criminal enterprise across Cambridge

Mill Road, Cambridge: We should be following the lead of successful towns and cities around the globe in reducing traffic and making our shopping streets attractive places where people want to spend time. Mill Road, Cambridge: We should be following the lead of successful towns and cities around the globe in reducing traffic and making our shopping streets attractive places where people want to spend time.
News3 weeks ago

Opinion: We have a positive vision for a Mill Road Cambridge that is vibrant, attractive, safe, and healthy

'Surely it’s local residents who should decide the fate of a ‘C’ road'

On September 4 the Combined Authority board is being invited to re-appoint John Hill, East Cambridgeshire District Council chief executive, as returning officer for the mayoral election on May 1, 2025 On September 4 the Combined Authority board is being invited to re-appoint John Hill, East Cambridgeshire District Council chief executive, as returning officer for the mayoral election on May 1, 2025
News3 weeks ago

John Hill ‘bags’ top role in Cambridgeshire and Peterborough Combined Authority mayoral election 2025

Combined Authority has allocated £1.04m for the 2025 elections

Police are appealing for witnesses and dashcam footage after a man died in a collision on the B645 in Cambridgeshire Police are appealing for witnesses and dashcam footage after a man died in a collision on the B645 in Cambridgeshire
News3 weeks ago

Driver, 22, dies after B645 crash in Cambridgeshire

St Neots woman passenger has serious injuries

An electricity pylon in Oldfield Lane Wisbech caught fire after being used to illegally abstract power to run a cannabis factory in a neighbouring scrapyard. A second cannabis factory elsewhere was discovered. PHOTO: Policing Fenland/Cambs Fire and Rescue An electricity pylon in Oldfield Lane Wisbech caught fire after being used to illegally abstract power to run a cannabis factory in a neighbouring scrapyard. A second cannabis factory elsewhere was discovered. PHOTO: Policing Fenland/Cambs Fire and Rescue
News3 weeks ago

£700,000 worth of cannabis plants seized after ‘accidental’ Wisbech pylon fire

306 plants worth £257,000 were growing inside lorry trailers

A teenage boy has died following a collision on the A1M on Saturday (24 August). A teenage boy has died following a collision on the A1M on Saturday (24 August).
News3 weeks ago

Teenage Cambridgeshire crash victim, 16, dies in hospital

Crash victim named as Isaac Nockels

A 14-year-old girl was attacked at about 4.20pm on Wednesday, 21 August, in the red car park of Queensgate Shopping Centre, Peterborough. A 14-year-old girl was attacked at about 4.20pm on Wednesday, 21 August, in the red car park of Queensgate Shopping Centre, Peterborough.
News3 weeks ago

Wanted: Man in connection with sexual assault of 14-year-old girl in Peterborough

Assault happened at Queensgate shopping centre