Connect with us

News

Shock Cambridge footbridge closures ‘unannounced and hugely controversial’

Closures will not affect access to the River Cam towpaths or access to Fen Road, Milton

Avatar photo

Published

on

Hundreds of children face a “long and significantly more dangerous” walk to their Cambridge school after the shock closure of Jesus Lock bridge. One angry resident told CambsNews that the closure of Jesus Lock bridge (Baits Bite Lock footbridge has also been closed) was “unannounced and hugely controversial.

“I think I was the first to spot the closure today, and I rang the Park Street Primary School to warn them that parents might be late this afternoon,” she said.

“Hundreds of children use that bridge as part of their journey to school.

Jesus Green Lock footbridge (above) and Baits Bite Lock footbridge have been temporarily closed, following the Conservators of the River Cam’s decision to close both locks. PHOTO: Camcycle

Jesus Green Lock footbridge (above) and Baits Bite Lock footbridge have been temporarily closed, following the Conservators of the River Cam’s decision to close both locks. PHOTO: Camcycle

“And the primary school had not even been warned.  Children will now have to take a long – and significantly more dangerous – route via Magdalene Street (lots of buses) and Chesterton Road (narrow curves and lots of traffic).”

The resident, a member of Camcycle but speaking in a personal capacity, said the controversial closure of Jesus Lock bridge was made by the “unelected, unaccountable, and obviously naïve Cam Conservators.

“I can’t help wondering whether it is a lack of spending by them on preventative maintenance that has led to this ‘emergency’ closure. 

“It can’t be that much of an emergency, as cracks were apparently noticed at the start of the year – or perhaps we have all been in mortal danger for months.

Cambridgeshire County Council confirmed the decision to temporarily close the bridges “following the Conservators of the River Cam’s decision to close both locks”.

Jesus Green Lock footbridge (above) and Baits Bite Lock footbridge have been temporarily closed, following the Conservators of the River Cam’s decision to close both locks. PHOTO: Camcycle

Jesus Green Lock footbridge (above) and Baits Bite Lock footbridge have been temporarily closed, following the Conservators of the River Cam’s decision to close both locks. PHOTO: Camcycle

A county council spokesperson said: “A survey commissioned by the Conservators of the River Cam has revealed structural issues with the lock islands in both Cambridge and Milton locations.

“We are acting quickly to temporarily close both bridges as a precaution whilst we carry out surveys and assessments to understand the impact of the lock islands’ condition on the bridge structures.”

The bridge closures were put in place on Tuesday afternoon.

“These closures will not affect access to the River Cam towpaths or access to Fen Road, Milton,” said the spokesperson.

Cllr Alex Beckett, chair of the highways and transport committee said: “We have a duty to ensure the safety of our paths and highways and we understand that this will come as disappointing news to the local communities including the River Cam community and those regularly using the footbridges, particularly with the beer festival this week.

Jesus Green Lock footbridge (above) and Baits Bite Lock footbridge have been temporarily closed, following the Conservators of the River Cam’s decision to close both locks. PHOTO: Camcycle

Jesus Green Lock footbridge (above) and Baits Bite Lock footbridge have been temporarily closed, following the Conservators of the River Cam’s decision to close both locks. PHOTO: Camcycle

“Our officers are liaising with the Cam Conservators, the Environment Agency who operate the sluices in these locations and City and South Cambridgeshire District Councils on both of these closures.

Advertisements
canopyuk.com in-article

“We will be keeping the public and our stakeholders updated on our work by sharing further news later in the week once bridge surveys have been carried out. We will reopen the bridges as soon as we are satisfied with their safety.”

He said alternative pedestrian routes for Jesus Green Lock footbridge are Magdalene bridge and Victoria Road bridge.

Clayhithe Road bridge or the Abbey-Chesterton footbridge are the nearest River Cam pedestrian crossing points to Baits Bite Lock.

The council spokesperson added: “Diversion signage will be put in place as soon as possible on both sides of the river in both Cambridge and Milton to advise pedestrians of alternative routes”.

A statement from Cam Conservators said: “Due to safety concerns regarding the structural integrity of the lock islands at Baits Bite and Jesus Green, the decision has been taken to temporarily close the locks until further notice.

“More detailed structural investigations will be undertaken and a plan for remedial works developed urgently.

“The Conservators are engaging with the Environment Agency and Local Authorities to seek a coordinated approach.”

BRIEFING from Cam Conservators 

The Conservators of the River Cam are responsible for the navigation (the river) from Mill Pool in Cambridge to Bottisham Lock (Waterbeach) and the locks in between, namely Jesus Green Lock (JGL) in Cambridge and Bait’s Bite Lock (BBL).

​Each lock has an island between the lock chamber and the sluice and weir structures, which it supports.

At both Jesus Lock and Baits Bite Lock, the Conservators own the lock and lock island, while the Environment Agency (EA) own and operate the sluice and weir. In addition, the lock islands support footbridges and public right of way in these locations, which are managed by the relevant Local Authorities.

​Following observations of cracks in both lock islands, early in 2024 the Conservators of the River Cam commissioned structural surveys.

​The consequent reports identify significant structural fragility in the lock islands and a need for reinforcement work in the short to medium term.

​The Conservators have collectively reviewed the reports and are urgently drawing up a detailed risk assessment, commissioning more detailed surveys, and developing a project plan for remedial works.

For any enquiries, please contact the Clerk for the Conservators of the River Cam: Tracy Yarrow @ [email protected]

 

Facebook

Read More

News3 weeks ago

Cambs transport charity launches scathing attack after losing subsidised bus route to Stagecoach

FACT operated the 68 Wisbech service for a number of years

News3 weeks ago

Mayor attacks ‘cheap theatre of negativity’ over £48m Peterborough station facelift

Labour hopes Great Northern Hotel will be in future phase of re-development

News3 weeks ago

Opposition to 8am to 11pm pavement wining and dining in Wisbech by Wetherspoon

In Whittlesey Wetherspoon hope to use Market Place for outdoor drinkers

News3 weeks ago

Cambridge ‘drug lord’ caught with loaded gun, cash, and £500,000 worth of drug

Rahman ran a criminal enterprise across Cambridge

Mill Road, Cambridge: We should be following the lead of successful towns and cities around the globe in reducing traffic and making our shopping streets attractive places where people want to spend time. Mill Road, Cambridge: We should be following the lead of successful towns and cities around the globe in reducing traffic and making our shopping streets attractive places where people want to spend time.
News3 weeks ago

Opinion: We have a positive vision for a Mill Road Cambridge that is vibrant, attractive, safe, and healthy

'Surely it’s local residents who should decide the fate of a ‘C’ road'

On September 4 the Combined Authority board is being invited to re-appoint John Hill, East Cambridgeshire District Council chief executive, as returning officer for the mayoral election on May 1, 2025 On September 4 the Combined Authority board is being invited to re-appoint John Hill, East Cambridgeshire District Council chief executive, as returning officer for the mayoral election on May 1, 2025
News3 weeks ago

John Hill ‘bags’ top role in Cambridgeshire and Peterborough Combined Authority mayoral election 2025

Combined Authority has allocated £1.04m for the 2025 elections

Police are appealing for witnesses and dashcam footage after a man died in a collision on the B645 in Cambridgeshire Police are appealing for witnesses and dashcam footage after a man died in a collision on the B645 in Cambridgeshire
News3 weeks ago

Driver, 22, dies after B645 crash in Cambridgeshire

St Neots woman passenger has serious injuries

An electricity pylon in Oldfield Lane Wisbech caught fire after being used to illegally abstract power to run a cannabis factory in a neighbouring scrapyard. A second cannabis factory elsewhere was discovered. PHOTO: Policing Fenland/Cambs Fire and Rescue An electricity pylon in Oldfield Lane Wisbech caught fire after being used to illegally abstract power to run a cannabis factory in a neighbouring scrapyard. A second cannabis factory elsewhere was discovered. PHOTO: Policing Fenland/Cambs Fire and Rescue
News3 weeks ago

£700,000 worth of cannabis plants seized after ‘accidental’ Wisbech pylon fire

306 plants worth £257,000 were growing inside lorry trailers

A teenage boy has died following a collision on the A1M on Saturday (24 August). A teenage boy has died following a collision on the A1M on Saturday (24 August).
News3 weeks ago

Teenage Cambridgeshire crash victim, 16, dies in hospital

Crash victim named as Isaac Nockels

A 14-year-old girl was attacked at about 4.20pm on Wednesday, 21 August, in the red car park of Queensgate Shopping Centre, Peterborough. A 14-year-old girl was attacked at about 4.20pm on Wednesday, 21 August, in the red car park of Queensgate Shopping Centre, Peterborough.
News3 weeks ago

Wanted: Man in connection with sexual assault of 14-year-old girl in Peterborough

Assault happened at Queensgate shopping centre